CUSTOMER CASENEOM Workers Villages
BIM Collaboration Drives Efficiency and Sustainability at NEOM Workers Villages
2024-12-31
1 min read
Key project challenges:
- Adopt BIM from concept to coordinate information flow between designers, engineers and external contractors.
- Work with partners who are experienced in BIM and have the required expertise in hardware specification.
- Enable workflows which promote creativity and a methodical, technically astute approach to building design.
- Ensure open, transparent communication for the duration of the project, which encourages collaboration.
Solutions:
Qantara Development champions the BIM process for boosting productivity and expediting delivery, showcasing industry-leading technical efficiency in design and construction. At NEOM Workers Villages, their collaboration with ASSA ABLOY leveraged Openings Studio™ software.
ASSA ABLOY Opening Solutions provides detailed door specifications that integrate seamlessly with Revit®, streamlining information sharing and hardware updates within the BIM environment. By eliminating manual data handling, Openings Studio™ ensured efficient updates without information loss, keeping hardware and certification data, including fire and egress ratings, readily accessible.